Trending Ochanja Road: Facts Not Fiction

IMG 20240326 WA0066

After an on-the-spot visit to the trending Ochanja road to ascertain the veracity of the viral video, the following facts are hereby presented:

— That the video did not capture the actual portion of the road, which is less than two (2) feet.

IMG 20240326 WA0065

— That the road in question is an active construction site, and work is seriously ongoing, even as of yesterday, Monday, March 25, 2024.

— The portion of Ochanja Road was asphalted yesterday and couldn’t cure and stabilize properly before the downpour.

— That the cause of the heavy water body that affected the less than 2 feet of the asphalted portion was a silted drainage.

— The stone base alone on that portion of the road, and indeed the long stretch of the entire road is solid and very much intact.

— The creator of the video grossly exaggerated the situation by showing portions of a different road that is not under construction.

— That the ongoing road has not been completed and commissioned by the government of Prof. Charles Chukwuma Soludo CFR.

— That only the Port Harcourt Road and Niger Street Road have been commissioned by Governor Soludo in Onitsha South LGA, and they are very firm and solid.

See also  President Tinubu Reaffirms Commitment to Niger Delta Development

— The story is, at best, a deliberate distortion and overbloating of reality by mischief makers.

Recommended For You

About the Author: Akelicious

Leave a Reply

Your email address will not be published. Required fields are marked *